Overview

STACK offers several Quick Start assemblies for Roofing. There is one pitched shingle assembly and several for single membrane fields and parapets.


More on Quick Start Assemblies

02 Asphalt Quick Start Assemblies

04 Masonry Quick Start Assemblies

06 Wood, Plastics & Composites

09 Finishes Quick Start Assemblies

32 Landscaping Quick Start Assemblies


Table of contents

  1. 07 Roofing

    1. EPDM Parapet (QS) - Linear

    2. EPDM Roof (QS) - Area

    3. PVC Parapet (QS) - Linear

    4. PVC Roof (QS) - Area

    5. Shingle Roof – Pitched Area

    6. TPO Parapet (QS) - Linear

    7. TPO Roof (QS) - Area

07 Roofing

EPDM Parapet (QS) - Linear

Summary:

This assembly is designed for a Linear takeoff.

Variables:

  • Parapet Height In Inches – this will be used to calculate all items in this assembly.

Required Items:

These items will be automatically added to your takeoff.

  • Roofing Labor – in squares.

  • EPDM Membrane – 10'x100’ Rolls.

  • EPDM Bonding Adhesive – in 5 Gallon Pails.

Item Groups:

There are no Item Groups in this assembly.

back to top

EPDM Roof (QS) - Area

Summary:

This assembly is designed for an Area takeoff.

Variables:

There are no variables in this assembly.

Required Items:

  • Roofing Labor – in squares.

  • EPDM Membrane – 10'x100’ Rolls.

Item Groups:

These groups contain a selection of items to choose if needed.

  • FA or MA – choose either boxes of fasteners or pails of adhesive.

back to top

PVC Parapet (QS) - Linear

Summary:

This assembly is designed for a Linear takeoff.

Variables:

  • Parapet Height In Inches – this will be used to calculate all items in this assembly.

Required Items:

These items will be automatically added to your takeoff.

  • Roofing Labor – in squares.

  • PVC Membrane – 10'x100’ Rolls.

  • PVC Bonding Adhesive – in 5 Gallon Pails.

Item Groups:

There are no Item Groups in this assembly.

back to top

PVC Roof (QS) - Area

Summary:

This assembly is designed for an Area takeoff.

Variables:

There are no variables in this assembly.

Required Items:

  • Roofing Labor – in squares.

  • PVC Membrane – 10'x100’ Rolls.

Item Groups:

These groups contain a selection of items to choose if needed.

  • FA or MA – choose either boxes of fasteners or pails of adhesive.

back to top

Shingle Roof – Pitched Area

Summary:

This assembly is designed for a Pitched Area takeoff

Variables:

There are no variables in this assembly.

Required Items:

  • Roofing Labor – in squares.

  • Shingles – total bundles at three bundles per square.

  • Roofing Nail Coil 7200 Count – total cases of nails.

Item Groups:

These groups contain a selection of items to choose if needed.

  • Choose Underlayment – an assortment of underlayment material in rolls.

  • Ice & Water Shield (Whole Roof) - choose only if this material will be applied to the whole roof.

back to top

TPO Parapet (QS) - Linear

Summary:

This assembly is designed for a Linear takeoff.

Variables:

  • Parapet Height In Inches – this will be used to calculate all items in this assembly.

Required Items:

These items will be automatically added to your takeoff.

  • Roofing Labor – in squares.

  • TPO Membrane – 10'x100’ Rolls.

  • TPO Bonding Adhesive – in 5 Gallon Pails.

Item Groups:

There are no Item Groups in this assembly.

back to top

TPO Roof (QS) - Area

Summary:

This assembly is designed for an Area takeoff

Variables:

There are no variables in this assembly.

Required Items:

  • Roofing Labor – in squares.

  • Seam Plates – in pails.

  • TPO Membrane – 10'x100’ Rolls.

Item Groups:

These groups contain a selection of items to choose if needed.

  • FA or MA – choose either boxes of fasteners or pails of adhesive.

back to top